Success Mode Commands 2008
From MLB Power Pros Wiki
Longball714 (Talk | contribs) |
m (Adjusted Page Names to normal naming convention) |
||
Line 8: | Line 8: | ||
== Schedule Commands == | == Schedule Commands == | ||
Schedule commands are actions that do not use up any part of the [[:Image:MLB_Power_Pros_2008_Weekly_Commands_Meter.jpg|Weekly Commands Meter]], but advance the schedule to the following week. One command is classified as a schedule command: | Schedule commands are actions that do not use up any part of the [[:Image:MLB_Power_Pros_2008_Weekly_Commands_Meter.jpg|Weekly Commands Meter]], but advance the schedule to the following week. One command is classified as a schedule command: | ||
- | *[[: | + | *[[:Progress_2008|Progress]] – Advance the Schedule. |
== Weekly Commands == | == Weekly Commands == | ||
Weekly commands are any actions that use one command of the Weekly Commands Meter. If the last command of the meter is used, then the schedule is advanced to the following week. Two commands are classified as weekly commands: | Weekly commands are any actions that use one command of the Weekly Commands Meter. If the last command of the meter is used, then the schedule is advanced to the following week. Two commands are classified as weekly commands: | ||
- | *[[: | + | *[[:Practice_2008|Practice]] – Conduct training. |
- | *[[: | + | *[[:Free_Time_2008|Free Time]] – Head out somewhere. |
== Non-Advancing Commands == | == Non-Advancing Commands == | ||
Non-Advancing commands are actions that do not use up any part of the Weekly Commands Meter, and do not advance the schedule to the following week. Five commands are classified as non-advancing commands: | Non-Advancing commands are actions that do not use up any part of the Weekly Commands Meter, and do not advance the schedule to the following week. Five commands are classified as non-advancing commands: | ||
- | *[[: | + | *[[:Boost_2008|Boost]] – Improve attributes. |
- | *[[: | + | *[[:Use_2008|Use]] – Utilize items. |
- | *[[: | + | *[[:Equip_2008|Equip]] – Equip gear. |
- | *[[: | + | *[[:Data_2008|Data]] – View data. |
- | *[[: | + | *[[:System_2008|System]] – Adjust settings. |
[[Category: Success_Mode_2008]] | [[Category: Success_Mode_2008]] | ||
[[Category: MLB Power Pros 2008]] | [[Category: MLB Power Pros 2008]] |
Revision as of 12:52, 13 September 2008
Commands are all the options on the schedule bar that exist at the beginning of every week. Commands can be broken up into three sections:
- Schedule Commands
- Weekly Commands
- Non-Advancing Commands
Schedule Commands
Schedule commands are actions that do not use up any part of the Weekly Commands Meter, but advance the schedule to the following week. One command is classified as a schedule command:
- Progress – Advance the Schedule.
Weekly Commands
Weekly commands are any actions that use one command of the Weekly Commands Meter. If the last command of the meter is used, then the schedule is advanced to the following week. Two commands are classified as weekly commands:
Non-Advancing Commands
Non-Advancing commands are actions that do not use up any part of the Weekly Commands Meter, and do not advance the schedule to the following week. Five commands are classified as non-advancing commands: