Success Mode Commands 2008
From MLB Power Pros Wiki
m (Modified the names to the correct convention with 2008 at the end) |
m (Removed additonal link references for Weekly Commands Meter - no need) |
||
Line 11: | Line 11: | ||
== Weekly Commands == | == Weekly Commands == | ||
- | Weekly commands are any actions that use one command of the | + | Weekly commands are any actions that use one command of the Weekly Commands Meter. If the last command of the meter is used, then the schedule is advanced to the following week. Two commands are classified as weekly commands: |
*[[:Weekly Commands:_Practice_2008|Practice]] – Conduct training. | *[[:Weekly Commands:_Practice_2008|Practice]] – Conduct training. | ||
*[[:Weekly Commands:_Free_Time_2008|Free Time]] – Head out somewhere. | *[[:Weekly Commands:_Free_Time_2008|Free Time]] – Head out somewhere. | ||
== Non-Advancing Commands == | == Non-Advancing Commands == | ||
- | Non-Advancing commands are actions that do not use up any part of the | + | Non-Advancing commands are actions that do not use up any part of the Weekly Commands Meter, and do not advance the schedule to the following week. Five commands are classified as non-advancing commands: |
*[[:Non-Advancing_Commands:_Boost_2008|Boost]] – Improve attributes. | *[[:Non-Advancing_Commands:_Boost_2008|Boost]] – Improve attributes. | ||
*[[:Non-Advancing_Commands:_Use_2008|Use]] – Utilize items. | *[[:Non-Advancing_Commands:_Use_2008|Use]] – Utilize items. |
Revision as of 04:08, 9 September 2008
Commands are all the options on the schedule bar that exist at the beginning of every week. Commands can be broken up into three sections:
- Schedule Commands
- Weekly Commands
- Non-Advancing Commands
Schedule Commands
Schedule commands are actions that do not use up any part of the Weekly Commands Meter, but advance the schedule to the following week. One command is classified as a schedule command:
- Progress – Advance the Schedule.
Weekly Commands
Weekly commands are any actions that use one command of the Weekly Commands Meter. If the last command of the meter is used, then the schedule is advanced to the following week. Two commands are classified as weekly commands:
Non-Advancing Commands
Non-Advancing commands are actions that do not use up any part of the Weekly Commands Meter, and do not advance the schedule to the following week. Five commands are classified as non-advancing commands: